Some properties are now open for 2027/28 bookings! See if your location is available, and book your student room early to enjoy rewards!*

NOW OPEN FOR 2026/27 Student Accommodation in Bristol

All the energy of Bristol, with none of the stress. Waterside is brand-new Bristol student accommodation, now open and welcoming students for the 2026/27 academic year. With modern en-suite and studio rooms designed for comfort, independence and effortless city living, it’s the perfect place to call home while you make the most of Bristol.

Just a few minutes’ walk from Bristol Temple Meads station and directly opposite the new University of Bristol Temple Quarter Enterprise Campus, Waterside is perfectly placed for student life in the city:

  • Bristol Dental School – a few mins walk away
  • University of Bristol main campus – 10-minute cycle away
  • UWE Bristol Arnolfini City Campus – 7 minutes by bike
  • BIMM Bristol – 8 minutes by bike
  • University of Law – 12-minute walk
  • Short commute to Bath via Bristol Temple Meads

Choose from stylish en-suite rooms or spacious studio apartments, each with a private bathroom, modern kitchen facilities, and smart storage. Whether you prefer a calm retreat or a more social setting, Waterside offers a home that matches your lifestyle.

Opening ready for September 2026, Waterside is brand-new Bristol student accommodation offering modern en-suite and studio rooms designed for comfort, independence, and effortless city living.

Just a few minutes’ walk from Bristol Temple Meads station and directly opposite the new University of Bristol Temple Quarter Enterprise Campus, Waterside is perfectly placed for student life in the city:

  • Bristol Dental School – a few mins walk away
  • University of Bristol main campus, UWE Bristol Arnolfini City Campus & BIMM Bristol– within a 10-minute cycle
  • University of Law – 12-minute walk
  • Short commute to Bath via Bristol Temple Meads

Choose from stylish en-suite rooms or spacious studio apartments, each with a private bathroom, modern kitchen facilities, and smart storage. Whether you prefer a calm retreat or a more social setting, Waterside offers a home that matches your lifestyle.

All the energy of Bristol, with none of the stress. Waterside is brand-new Bristol student accommodation, now open and welcoming students for the 2026/27 academic year. With modern en-suite and studio rooms designed for comfort, independence and effortless city living, it’s the perfect place to call home while you make the most of Bristol.

Just a few minutes’ walk from Bristol Temple Meads station and directly opposite the new University of Bristol Temple Quarter Enterprise Campus, Waterside is perfectly placed for student life in the city:

  • Bristol Dental School – a few mins walk away
  • University of Bristol main campus – 10-minute cycle away
  • UWE Bristol Arnolfini City Campus – 7 minutes by bike
  • BIMM Bristol – 8 minutes by bike
  • University of Law – 12-minute walk
  • Short commute to Bath via Bristol Temple Meads

Choose from stylish en-suite rooms or spacious studio apartments, each with a private bathroom, modern kitchen facilities, and smart storage. Whether you prefer a calm retreat or a more social setting, Waterside offers a home that matches your lifestyle.

Stress-free student living. All bills included, superfast Wi-Fi, communal lounge, games room, content creation room, karaoke room, gym, ‘The Hub’ social and study space, quiet study room, laundry, and reception with meet & greet area. Plus, 24/7 CCTV, secure key fob access, and a friendly on-site team for total peace of mind.

From your 24/7 on-site team to secure access and regular social events, Waterside makes student life simple. Live, study, and thrive in the heart of Bristol.

Get £650 Cashback for 26/27!

When using code: NB650

Book a Standard Studio at Waterside for the 2026/27 academic year, and we’ll give you £650 cashback when you use the code: NB650. View all offers

BRAND NEW for 2026

Karaoke rooms

Content creation room

Gym

Private dining room

Lounge

Quiet study room

Social hub

En suites & studios

Opposite Bristol Temple Meads

On-site Property Team

All bills included

BRAND NEW for 2026

Karaoke rooms

Content creation room

Gym

Private dining room

Lounge

Quiet study room

Social hub

En suites & studios

Opposite Bristol Temple Meads

On-site Property Team

All bills included

BRAND NEW for 2026

Karaoke rooms

Content creation room

Gym

Private dining room

Lounge

Quiet study room

Social hub

En suites & studios

Opposite Bristol Temple Meads

On-site Property Team

All bills included

BRAND NEW for 2026

Karaoke rooms

Content creation room

Gym

Private dining room

Lounge

Quiet study room

Social hub

En suites & studios

Opposite Bristol Temple Meads

On-site Property Team

All bills included

Choose your room.


Almost gone +17 images

Classic 8 Bed Upper Floor Ensuite

From £265.00 weekly
•Almost gone

Perfect for those who enjoy a more social living environment, this 8-bed ensuite blends personal space and a lively shared environment.

  • Private bathroom
  • Shared kitchen & living space
  • 3/4 bed with USB & USC sockets
  • wardrobe, drawers & full length mirror
  • Desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £265.00 weekly
•Almost gone

Perfect for those who enjoy a more social living environment, this 8-bed ensuite blends personal space and a lively shared environment.

  • Private bathroom
  • Shared kitchen & living space
  • 3/4 bed with USB & USC sockets
  • wardrobe, drawers & full length mirror
  • Desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

Perfect for those who enjoy a more social living environment, this 8-bed ensuite blends personal space and a lively shared environment. Your en suite bedroom comes with a small double bed, room to store all your things and desk for studying. The generous kitchen and lounge areas give everyone room to cook, relax, and spend time together without feeling crowded.

  • Private ensuite bedroom in an 8 bed flat
  • 3/4 double bed
  • Full length mirror
  • Ensuite shower room
  • Shared kitchen & living space
  • Storage
  • Wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance
Your room 14 Nov 2026 – 4 Sep 2027 £265.00 per week
£11,130.00 total amount
Almost gone +2 images

Classic 6 Bed Ensuite

From £265.00 weekly
•Almost gone

An ensuite room in a 6-bed flat, designed for students who want a balance of independence and living with friends.

  • Private bathroom
  • Shared kitchen & living space
  • 3/4 bed with USB & USC sockets
  • Wardrobe, drawers & full length mirror
  • Desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £265.00 weekly
•Almost gone

An ensuite room in a 6-bed flat, designed for students who want a balance of independence and living with friends.

  • Private bathroom
  • Shared kitchen & living space
  • 3/4 bed with USB & USC sockets
  • Wardrobe, drawers & full length mirror
  • Desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

An ensuite room in a 6-bed flat, designed for students who want a balance of independence and living with friends. Your private ensuite bedroom is fully equipped with plenty of storage and study space, and is complemented by a spacious shared kitchen and lounge — perfect for cooking together, catching up after lectures, and creating a comfortable daily routine.

  • Private ensuite bedroom in a 6 bed flat
  • 3/4 double bed
  • Full length mirror
  • Ensuite shower room
  • Shared kitchen & living space
  • Storage
  • Wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance
Your room 14 Nov 2026 – 4 Sep 2027 £265.00 per week
£11,130.00 total amount
Almost gone +17 images

Classic 8 Bed Ensuite

From £265.00 weekly
•Almost gone

Perfect for those who enjoy a social atmosphere, this layout offers our largest en suite bedrooms at 14.04 – 14.25m².

  • Private bathroom
  • Shared kitchen & living space
  • 3/4 bed with USB & USC sockets
  • Wardrobe, drawers & full length mirror
  • Desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £265.00 weekly
•Almost gone

Perfect for those who enjoy a social atmosphere, this layout offers our largest en suite bedrooms at 14.04 – 14.25m².

  • Private bathroom
  • Shared kitchen & living space
  • 3/4 bed with USB & USC sockets
  • Wardrobe, drawers & full length mirror
  • Desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

Perfect for those who enjoy a more social living environment, this 8-bed ensuite blends personal space and a lively shared environment. Your en suite bedroom comes with a small double bed, room to store all your things and desk for studying. The generous kitchen and lounge areas give everyone room to cook, relax, and spend time together without feeling crowded.

  • Private ensuite bedroom in an 8 bed flat
  • 3/4 double bed
  • Full length mirror
  • Ensuite shower room
  • Shared kitchen & living space
  • Storage
  • Wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance

Tenancy length

How long would you like to stay?

Your room 14 Nov 2026 – 17 Jul 2027 £265.00 per week
£9,275.00 total amount
Last room +7 images

Classic 6 Bed Upper Floor Ensuite

From £265.00 weekly
•Last room

An ensuite room in a 6-bed flat, designed for students who want a balance of independence and living with friends.

  • Private bathroom
  • Shared kitchen & living space
  • 3/4 bed with USB & USC sockets
  • Wardrobe, drawers & full length mirror
  • Desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £265.00 weekly
•Last room

An ensuite room in a 6-bed flat, designed for students who want a balance of independence and living with friends.

  • Private bathroom
  • Shared kitchen & living space
  • 3/4 bed with USB & USC sockets
  • Wardrobe, drawers & full length mirror
  • Desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

An ensuite room in a 6-bed flat, designed for students who want a balance of independence and living with friends. Your private ensuite bedroom is fully equipped with plenty of storage and study space, and is complemented by a spacious shared kitchen and lounge — perfect for cooking together, catching up after lectures, and creating a comfortable daily routine.

  • Private ensuite bedroom in a 6 bed flat
  • 3/4 double bed
  • Full length mirror
  • Ensuite shower room
  • Shared kitchen & living space
  • Storage
  • Wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance
Your room 14 Nov 2026 – 17 Jul 2027 £265.00 per week
£9,275.00 total amount
Almost gone +7 images

Standard (Floor 7-8) Studio

From £315.00 weekly
•Almost gone

A modern, spacious studio with everything you need for independent living.

  • Average size room 18.56-20.67sqm
  • Floor 7-8
  • Private bathroom
  • King size or small double bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £315.00 weekly
•Almost gone

A modern, spacious studio with everything you need for independent living.

  • Average size room 18.56-20.67sqm
  • Floor 7-8
  • Private bathroom
  • King size or small double bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

A well-designed private studio featuring 18.56 – 20.67m² of space, with everything you need for independent living. including a modern ensuite shower room, private kitchen area with breakfast bar, dedicated study area, and a king-size or small double bed, check with property team for confirmation. Ideal if you want a calm, self-contained space with the freedom to live at your own pace.

  • Private ensuite studio
  • King size / small double bed
  • Full length mirror
  • Ensuite shower room
  • Private open plan kitchen
  • Breakfast bar and stool
  • Storage
  • Triple wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance

Tenancy length

How long would you like to stay?

Your room 14 Nov 2026 – 17 Jul 2027 £315.00 per week
£11,025.00 total amount
Limited availability +7 images

Standard (Floor 9-10) Studio

From £320.00 weekly
•Limited availability

A spacious, well-designed private studio, with everything you need for independent living.

  • Average size room 18.56 – 20.67sqm
  • King size or small double bed
  • Floor 9-10
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £320.00 weekly
•Limited availability

A spacious, well-designed private studio, with everything you need for independent living.

  • Average size room 18.56 – 20.67sqm
  • King size or small double bed
  • Floor 9-10
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

A well-designed private studio featuring 18.56 – 20.67m² of space, with everything you need for independent living. including a modern ensuite shower room, private kitchen area with breakfast bar, dedicated study area, and a king-size or small double bed, check with property team for confirmation. Ideal if you want a calm, self-contained space with the freedom to live at your own pace.

  • Private ensuite studio
  • King size / small double bed
  • Full length mirror
  • Ensuite shower room
  • Private open plan kitchen
  • Breakfast bar and stool
  • Storage
  • Triple wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance

Tenancy length

How long would you like to stay?

Your room 14 Nov 2026 – 2 Jan 2027 £330.00 per week
£2,310.00 total amount
Almost gone +7 images

Standard (Floor 11) Studio

From £325.00 weekly
•Almost gone

A modern, spacious studio with everything you need for independent living.

  • Average size room 18.56-20.67sqm
  • Floor 11
  • Private bathroom
  • King size or small double bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £325.00 weekly
•Almost gone

A modern, spacious studio with everything you need for independent living.

  • Average size room 18.56-20.67sqm
  • Floor 11
  • Private bathroom
  • King size or small double bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

A well-designed private studio featuring 18.56 – 20.67m² of space, with everything you need for independent living. including a modern ensuite shower room, private kitchen area with breakfast bar, dedicated study area, and a king-size or small double bed, check with property team for confirmation. Ideal if you want a calm, self-contained space with the freedom to live at your own pace.

  • Private ensuite studio
  • King size / small double bed
  • Full length mirror
  • Ensuite shower room
  • Private open plan kitchen
  • Breakfast bar and stool
  • Storage
  • Triple wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance
Your room 14 Nov 2026 – 4 Sep 2027 £325.00 per week
£13,650.00 total amount
Last room +7 images

Standard (Floor 1-2) Studio

From £335.00 weekly
•Last room

A modern, spacious studio with everything you need for independent living.

  • Average size room 18.56-20.67sqm
  • Floor 1-2
  • Private bathroom
  • King size or small double bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £335.00 weekly
•Last room

A modern, spacious studio with everything you need for independent living.

  • Average size room 18.56-20.67sqm
  • Floor 1-2
  • Private bathroom
  • King size or small double bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

A well-designed private studio featuring 18.56 – 20.67m² of space, with everything you need for independent living. including a modern ensuite shower room, private kitchen area with breakfast bar, dedicated study area, and a king-size or small double bed, check with property team for confirmation. Ideal if you want a calm, self-contained space with the freedom to live at your own pace.

  • Private ensuite studio
  • King size / small double bed
  • Full length mirror
  • Ensuite shower room
  • Private open plan kitchen
  • Breakfast bar and stool
  • Storage
  • Triple wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance
Your room 14 Nov 2026 – 17 Jul 2027 £335.00 per week
£11,725.00 total amount
Limited availability +7 images

Premium Studio

From £345.00 weekly
•Limited availability

A step up in comfort and style, our Premium studios offer a bigger space designed for independent living

  • Average size room 21.17-22.101sqm
  • Private bathroom
  • King size or small double bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £345.00 weekly
•Limited availability

A step up in comfort and style, our Premium studios offer a bigger space designed for independent living

  • Average size room 21.17-22.101sqm
  • Private bathroom
  • King size or small double bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

A step up in comfort and style, our Premium studios offer 21.17 – 22.01m² of space designed for easy city living. Enjoy a king-size or small double bed (check with the property team for confirmation), a spacious private kitchen with a breakfast bar, and your own ensuite bathroom. All bills, Wi-Fi, and contents insurance are included, making premium living simple and stress-free.

  • Private ensuite studio
  • King size / small double bed
  • Full length mirror
  • Ensuite shower room
  • Private open plan kitchen
  • Breakfast bar and stool
  • Storage
  • Wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance

Tenancy length

How long would you like to stay?

Your room 14 Nov 2026 – 4 Sep 2027 £345.00 per week
£14,490.00 total amount
Last few rooms +3 images

Accessible Premium Studio

From £390.00 weekly
•Last few rooms

A step up in comfort and style, our Premium accessible studio offer a bigger space designed for easy independent living

  • Average size room 21.17-22.101sqm
  • Private bathroom
  • King size bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI
From £390.00 weekly
•Last few rooms

A step up in comfort and style, our Premium accessible studio offer a bigger space designed for easy independent living

  • Average size room 21.17-22.101sqm
  • Private bathroom
  • King size bed
  • Private open plan kitchen
  • Lots of storage
  • Triple wardrobe, drawers & full length mirror
  • Large desk, chair & pin board
  • All bills included
  • Contents insurance
  • WIFI

About this room

  • Private ensuite studio
  • King size bed
  • Full length mirror
  • Ensuite shower room
  • Private open plan kitchen
  • Breakfast bar and stool
  • Storage
  • Wardrobe
  • Desk with drawers & chair
  • Pin board
  • USB & USC sockets by the bed
  • Coat hooks
  • All bills included
  • Free Wi-Fi
  • Free contents insurance
Your room 14 Nov 2026 – 4 Sep 2027 £390.00 per week
£16,380.00 total amount
Sold out

Classic 5 Bed Ensuite

Join our waiting list, and we’ll let you know if they become available.

Sold out

Deluxe Studio

Join our waiting list, and we’ll let you know if they become available.

Sold out

Executive Studio

Join our waiting list, and we’ll let you know if they become available.

Sold out

Standard (Floor 3-4) Studio

Join our waiting list, and we’ll let you know if they become available.

Sold out

Standard (Floor 5-6) Studio

Join our waiting list, and we’ll let you know if they become available.

Check out our current offers.

Get £650 Cashback for 26/27! When using code: NB650

Book a Standard Studio at Waterside for the 2026/27 academic year, and we’ll give you £650 cashback when you use the code: NB650
Read the T&Cs

Free Dual Occupancy on Studio bookings! When using code: DUALOCC

Limited time only - Share your studio for the 2026/27 academic year at no extra cost!
Read the T&Cs

Refer a friend and get £150 each!

If you are a current resident of Waterside for the 2026/27 academic year and you refer a friend who books a room for 2026/27, you will each receive £150 cashback!
Read the T&Cs
  • BRAND NEW for September 2026
  • 2 mins from Bristol Temple Meads
  • Opposite Bristol Uni’s Temple Quarter Enterprise Campus
  • Gym
  • Content creation room
  • Karaoke rooms
  • King-size beds available in some studios
  • Quiet study room
  • Games room
  • Lounge
  • Private dining room
  • Resident events
  • All bills included
  • Free Wi-Fi
  • Wellbeing support
  • Laundry room with space to study
  • Cycle store
  • Recycling facilities
  • Post room
  • USB and USC ports in plug sockets
Loading map…

Distance Information

Bristol Uni – Temple Quarter Enterprise Campus 2 mins walk
Bristol Uni Dental School 7 mins walk
Bristol Temple Meads Train Station 8 mins walk
University of Law 12 mins walk
UWE Bristol City Campus 7 mins cycle
BIMM Music Institute 8 mins cycle
University of Bristol 16 mins cycle

Award-winning

Resident events

Wellbeing support

All bills included

Safe & secure

On-site property teams

Study spaces

Social areas

Wellbeing support

Award-winning

Resident events

Wellbeing support

All bills included

Safe & secure

On-site property teams

Study spaces

Social areas

Wellbeing support

Award-winning

Resident events

Wellbeing support

All bills included

Safe & secure

On-site property teams

Study spaces

Social areas

Wellbeing support

Award-winning

Resident events

Wellbeing support

All bills included

Safe & secure

On-site property teams

Study spaces

Social areas

Wellbeing support

FAQ’s: Living at Waterside Bristol Student Accommodation

Waterside has ensuite rooms in 5,6 or 8 bedroom shared flats or private en suite studios – perfect whether you want to live with friends or have your own space.

Prices:

  • En-suite rooms: 
    • Classic 6 Bed Ensuite – Sold Out
    • Classic 6 Bed Ensuite Upper Floor – Sold Out
    • Classic 5 Bed Ensuite – Sold Out
  • Studios: 
    • Standard Studio (Floor 1-2) – from £325pw
    • Standard Studio (Floor 3-4) – from £335pw
    • Standard Studio (Floor 5-6) – from £345pw
    • Standard Studio (Floor 7-8) – from £360pw
    • Standard Studio (Floor 9-10) – from £370pw
    • Standard Studio (Floor 11) – from £380pw
    • Premium Studio – from £390pw
    • Accessible Premium Studio – Sold Out
    • Deluxe Studio – from £399pw
    • Executive Studio – from £410pw

So whether you’re after a budget-friendly ensuite or a top-floor studio, there’s a room that fits your style and budget.

Our marketing suite is now open. Please email waterside@host-students.com or call +44 (0)117 363 7987 and we can book in a viewing for you.

Some key highlights in the building schedule of Waterside are:

  • Scaffold on Block A will be removed was removed at the end of Jan 26

  • Scaffold on Block B will be removed in early March 26

  • Our bedrooms will be completed in March (Block A) and April (Block B)

  • The fit out of our amenity spaces commences in April 26, and will be completed in June

  • And you can move in to your room in September 2026!

Waterside construction timeline.

The important question! You can find out everything you need to know about our payment options in our payments and guarantor guide. Once you’ve booked you’ll also be able to see when your payments are due in your account on the Host Portal.

Waterside is less than 5 minutes’ walk to Bristol Temple Meads train station and major bus routes. You’ll be within walking distance of Bristol city centre and Cabot Circus.

Yes! Waterside has a packed social calendar to keep you busy. You’ll find events and activities in the social hub, and you can also hang out in the games area or join study and social sessions organised by the on-site team. Join in on a singalong in the Karaoke rooms or share a meal in the private dining space. Waterside is designed to make meeting friends and getting involved easy and fun.

Absolutely. Every room comes with free, superfast Wi‑Fi and wired internet , perfect for studying, streaming, and gaming. No need to worry about extra bills; it’s all included.

Host properties take safety seriously. At Waterside, there’s a 24/7 security coverage with an on-site team, CCTV coverage, secure key fob access, and lifts to all floors. Staff are always on hand to help, giving you peace of mind while you live, study, and socialise.

No – we don’t take a deposit or booking fee. You’ll just pay a small advance rent payment when booking. This isn’t an extra payment – it goes towards your first rent instalment (if you’re paying in full) or your second rent instalment (if you are paying by instalment plan). Simple, stress-free, done. 

No – basic cover is included in your rent! Full details are provided when you move in, or you can see details here.

Secure bicycle parking is available on-site. We don’t have parking, but we’re just a few minutes walk from Temple Meads Train Station so it’s easy to get around Bristol on public transport. 

Yes! We have a laundry room on site with both washers and dryers. There’s plenty of space to hang out or study if you want to wait while your washing is on.

Yes – Waterside offers wheelchair-accessible rooms and has lifts to all floors, making it easier for students with mobility needs to get around the building. If you have an accessibility need please speak to the property team so we can help you select your perfect room. 

Waterside operates a no place no pay policy.

Don’t leave booking your student accommodation to the last minute. Secure your room today and if you don’t get the grades you need for university and no longer require the room, you won’t be charged a penny.

T&C’s apply. Please speak to our residents team for full terms and conditions.

See all Host FAQs